Garin calls for ‘effective’ implementation as flood control funds return
Residents wade through floodwaters to reach the tombs of their departed loved ones at the H.I. Cemetery in Hagonoy, Bulacan, on October 31, 2025 — two days before the observance of All Souls’ Day. Floodwaters remain stagnant in several parts of Hagonoy — a municipality long plagued by recurring inundation, which has recently drawn attention following the discovery of alleged anomalous flood-control projects involving several lawmakers, regional DPWH engineers, and other government officials. Maria Tan, ABS-CBN News MANILA — House Deputy Speaker Janette Garin of Iloilo acknowledged government cannot abandon flood control projects, adding however that these should be implemented correctly and effectively.
She issued the statement with the return of allocations for flood control projects in the 2027 national budget. None were allocated in this year’s budget in response to the corruption controversy surrounding them.
“Hindi natin pwedeng patayin at ihinto ang lahat ng flood control programs dahil ‘yan ay kaakibat sa ating pag-prepare sa climate change at sa lahat pa ng mga kailangang solusyunan in relation to flooding,” she said.
(We cannot kill off or halt the flood control programs because they come with our preparations for climate change and with all other issues related to flooding.)
She acknowledged some disagreement between the House and the Senate on the projects, adding she believes the chambers will come together “in our call for effective project implementation, no substandard, no ghost and no overpriced projects.”
She said the House followed Department of Public Works and Highways mandates on allocations for the flood control projects.
“Una, andyan ‘yung need versus wants, kung saan nilalagay ‘yung pondo doon sa talagang kailangan dapat paglagyan,” she said.
(First, there is the ‘needs versus wants’, where money is put where it is really needed.)
She added projects must have supporting documents like the actual program of works as well as contract pricing information and minimum standards that contractors must meet.
The House of Representatives approved on Tuesday a proposed measure establishing a unified Metro Manila Flood Control and Drainage System Management Master Plan.
House Bill 11602 also seeks to institutionalize inter-agency and inter-local coordinations on the master plan, as well as provide for oversight and funding mechanisms.
Garin called passage of the measure a “very important step” in addressing flooding that that affects people’s lives and livelihood.